81 North and South rest stops are identical rest stops that are opposite of each other on Interstate 81 in West Hanover Township
Both the masonry and waterproofing teams had the opportunity to perform work on these buildings.
The masonry scope of work consisted of:
Identical Rest Stops (North and South) opposite of each other on Interstate 81.
-Int./ Ext load-bearing CMU Walls
-Interior Astra-Glaze CMU Walls
-Int./ Ext Modular Brick Veneer
-Pump House- CMU back-up with brick veneer.
The masonry Included:
-10,750 Standard Gray CMU
-5,300 Ground Face CMU
-15,200 Astra-Glaze CMU
-58,000 Modular Brick
-150 Yards of Grout
The Waterproofing team also provided services for the -81N & 81S Rest Stops:
-Fluid applied AVB
-4100 SF (Each Building)
-Caulking and Firestop
-2953 LF (Each Building)
-Brick Control Joints
-CMU Control Joints
-Brick to CMU
-Interior CMU Control Joints
-Exterior Concrete Joints
The masonry and waterproofing team worked together to complete a beautiful finished project with superior quality work.