Manheim Township Middle School is a 245,000 SF building that serves about 1,200 students.
Among its features are an open concept main commons area and cafeteria, a black box theater, landscaped courtyard, outdoor classroom spaces, and a large gymnasium. The Construction began in
spring/summer of 2019 and opened to students and faculty at the beginning of the 2021-22 academic year.
The scope of work consisted of:
-Int./Ext. load-bearing CMU walls, stair, and
elevator shafts.
-Int./Ext. Utility Brick Veneer w/Precast
architectural concrete window sills and interior
column enclosures.
-Ext. CMU and Utility Brick Veneer site walls
w/Precast Architectural Concrete wall cap.
The project included:
-More than 350,000 CMU
-Nearly 240,000 Utility Brick
-More than 600 pieces of Precast architectural
concrete weighing over 80 tons
-2,500 yards of grout
This project was one of the largest projects in Witmer’s history! Shoutout to our amazing team members as they stayed on schedule even throughout the pandemic and delivered superior results.