Open Menu
Witmer Group
Contact
  • About Us
    • Leadership
    • Affiliations
  • Services
    • Masonry Restoration
    • Investigative Services
    • Concrete Coatings
    • Concrete Repair and Maintenance
    • Joint Sealants
    • Waterproofing, Air/Vapor Barrier Systems
    • New Masonry
    • Specialty Services
  • Projects
    • Masonry Restoration
    • Investigative Services
    • Concrete Coatings
    • Concrete Repair & Maintenance
    • Joint Sealants
    • Waterproofing & Air / Vapor Barriers
    • New Masonry
  • Careers
    • Apprenticeship Program – Earn while you learn
  • News & Events
  • Home
  • About Us
  • Leadership
  • Services
  • Projects
  • Careers
    • Apprenticeship Program – Earn while you learn
  • News & Events
  • Contact

NEW MASONRY – PEQUEA VALLEY JR – SR HIGH SCHOOL

February 2, 2024 - Written by: Anna Ricciardi

Progress continues at the Pequea Valley Jr- SR High School

The Pequea Valley School District is building a new school to replace the existing Pequea Valley Intermediate and High School buildings. The design reorganizes the educational program to focus upon 21st century principles of collaborative and independent educational design, sustainability and safe school design. Classrooms are organized into pods of classrooms incorporating open collaborative zones and small group instruction with localized support program to maximize instructional time. Program adjacencies were key in developing the building organization in a way that allowed for cross-disciplinary collaboration between the science, agriculture, CORE, and STEM programs. The educational programs are extended onto the site through outdoor classrooms, a CORE construction yard, and an agriculture yard.

The Witmer Group’s scope of work encompasses a one- and two-level masonry structure with CMU back-up and interior walls, featuring brick and Ground face CMU with cast stone windowsills. The following materials are required for this work:

-369,647 ea. Grey CMU
-1886 yards Grout Block Fill
-28,197 ea. Decorative Ground Face CMU
-79,898 ea. Utility Brick
-56,047 sf. 2-1/2” Rigid Polystyrene Insulation

http://www.cra-architects.com/project/pequea-valley-middle-high-school/

Related Posts

Multi Award-winning project: Charles L. Benton Building, Baltimore
June 2, 2018
Reading Healthplex
Reading HealthPlex – 7th Avenue Building – 2017 ABC Keystone Award Winner
June 2, 2018
Burnside Bridge
Burnside Bridge Restoration – Masonry Magazine Case Study
August 6, 2018

Filed Under: News

Witmer Group

1003 Cornerstone Drive
Mount Joy, PA 17552
P: 717.653.1428
F: 717.653.6859

4690 Millennium Drive
3rd Floor Suites 312 + 313
Belcamp, MD 21017
P: 410.244.7077

  • About Us
  • Services
  • Projects
  • Careers
  • Bamboo HR
  • News & Events
  • Affiliations
  • Service Brochures
  • Contact

© Witmer Group 2025 All Rights Reserved.  |  Site Map  |  Privacy Policy