Open Menu
Witmer Group
Contact
  • About Us
    • Leadership
    • Affiliations
  • Services
    • Masonry Restoration
    • Investigative Services
    • Concrete Coatings
    • Concrete Repair and Maintenance
    • Joint Sealants
    • Waterproofing, Air/Vapor Barrier Systems
    • New Masonry
    • Specialty Services
  • Projects
    • Masonry Restoration
    • Investigative Services
    • Concrete Coatings
    • Concrete Repair & Maintenance
    • Joint Sealants
    • Waterproofing & Air / Vapor Barriers
    • New Masonry
  • Careers
    • Apprenticeship Program – Earn while you learn
  • News & Events
  • Home
  • About Us
  • Leadership
  • Services
  • Projects
  • Careers
    • Apprenticeship Program – Earn while you learn
  • News & Events
  • Contact
Westminster

Westminster Place South at Windy Hill Village BACK

Project Background

The elements of this project include leading-edge concepts that further establish our waterproofing services offerings and provide the level of expertise and knowledge our clients require. This new four-story building will be one of less than 50 buildings in the United States to incorporate “Passive House Design”.

Passive building comprises a set of design principles used to attain a quantifiable and rigorous level of energy efficiency within a specific quantifiable comfort level. “Maximize your gains, minimize your losses” summarizes the approach. To that end, a passive building is designed and built in accordance with these five building-science principles:

  • Employs continuous insulation throughout its entire envelope without any thermal bridging.
  • The building envelope is extremely airtight, preventing infiltration of outside air and loss of conditioned air.
  • Employs high-performance windows (typically triple-paned) and doors.
  • Uses some form of balanced heat- and moisture-recovery ventilation and a minimal space conditioning system.
  • Solar gain is managed to exploit the sun’s energy for heating purposes in the heating season and to minimize overheating during the cooling season.

The work we performed included:

  • Bituminous Dampproofing on below grade foundation walls
  • 29,000 SF – Fluid-applied AVB on exterior plywood sheathing
  • Sealing 25,000 LF (approx. 5 miles) of sheathing joints and all fastener heads
  • Applied 11,000 LF (approx. 2 miles) Liquid Flashing around openings and transitions
  • Caulked 12,000 LF (approx. 2.3 miles) of joints

The project’s testing was extremely successful with airtight results.

Westminster
Westminster
Westminster
Westminster
Westminster

July 19, 2018

Witmer Group

1003 Cornerstone Drive
Mount Joy, PA 17552
P: 717.653.1428
F: 717.653.6859

4690 Millennium Drive
3rd Floor Suites 312 + 313
Belcamp, MD 21017
P: 410.244.7077

  • About Us
  • Services
  • Projects
  • Careers
  • Bamboo HR
  • News & Events
  • Affiliations
  • Service Brochures
  • Contact

© Witmer Group 2025 All Rights Reserved.  |  Site Map  |  Privacy Policy